Wednesday, 28 April 2010

Kitchen. Done.

Thank **** for that! Five weeks doesn't seem long until you live without a kitchen for that time. Also when your house is full of dust and mess and general building miscellany, you develop a sort of tic which doesn't go away until it's all sorted. The kitchen is perfect, or rather as perfect as a long and narrow kitchen can be. The bit at the end which opens up was the best part of the idea, it creates a destination so that the kitchen is a room to be in as opposed to purely a functional space. (God listen me, I've gone all Sarah Beeny!).

Fortunately the original work top had been cut too short so I did a deal to buy the useless bit and we've made a breakfast bar at the end which goes above a radiator. Another piece of genius created out of a mistake. The bar stools arrive today.

We're now in a predicament as to what to do with the loft. We have a 6-8 week window before the builders need to be off working on a major four house new build project and unless we start almost immediately they'll have to bugger off half way through. The problem is that in my naivety I applied to do the loft under planning permission. When you do this, in almost every instance, the planners make you scale down your plans. Because we'd already paid the architect I decided to capitulate and just get the planning through, based on a) at least we'd have some planning permission which we could sell on with house and b) we probably couldn't afford to do it anyway. It turns out however, that to do the simple loft which creates a small bedroom for Jake and a family bathroom using just the existing roof space (and therefore not needing PP) looks now to be impossible. We just haven't got the space up there to get the stairs in to allow a separate entrance for the bedroom AND the bathroom. There's no point in making it an ensuite as a) it's a single room - doesn't make sense - and b) we'd still have a bedroom downstairs without direct access to a bathroom - not sensible developing - so, I can either start work, apply to do the larger box dormer loft conversion and hope on hope that the permitted development consent comes through at the exact time we need it to OR wait until the boys finish the new build project.

Given that the overall plans for the loft centre around the potential to put a new baby somewhere and the knowledge that building projects ALWAYS take longer than anticipated, this could seriously affect things.


We could just create one bedroom in the loft within the existing pitched roof which would be a decent sixed double but then we'd need to cut our existing bedroom in half to make a corridor and turn our existing ensuite into a communal bathroom. I quite like this idea other than the fact that it involves building work on the first floor and therefore all the mess and disruption that goes with it.

I think that we will probably ask the architect to submit new drawings and get the builders started....this way most of the work will be done and we can then take a view on whether to build the box on the back or build the corridor downstairs, or budget allowing, both. It'll just be the difference between having two bathrooms or one and in a 3 bedroom house, 2 is a luxury but 1 is the norm.

Decisions, decisions.

Here's the kitchen. Good innit?!

No comments: